Case Study
8.1KW Optimised Solar PV Battery Ready in Torquay
Project Details:
Client Name: Torquay Golf Club
Industry: Commercial
Website: torquaygolfclub.co.uk
Location: Torquay
Project Completion: July 2025
£948
Estimated Annual Electricity Bill Savings *
57,000
Car km Avoided *
366
Tree’s Planted *
What were they trying to resolve:
This was the 2nd installation at Torquay Golf Club and further to the success of their first system wanted to continue their carbon footprint reduction and become more energy independent across the site.
Services Provided:
Technical Survey
Optimised with Tigo Technology
Hanger Bolt Rail Mounting
DC Electrical Connections
AC Electrical Connections
Full design and DNO consultation
NICEIC & MCS Certification
Dual System Monitoring (inc Panel Level)
All Black Mono Bifacial Panels
What was the solution?
From the survey we established the site required panel level monitoring in the event a stray golf ball struck the roof array along with a purlin fixed rail system to raise the system off the single skin sheet roof. We also design the array to avoid existing skylights to allow natural light to pass into the workshop.
What was the result?
We landed on a Tigo optimised 3PH system which also has the capability of adding batteries at a later date via the hybrid inverter. The inverter also allows for future expansion of additional panels on the higher roof should they wish to bolster their generation. The system was fed directly back to the main supply so the golf club can not only see individual panel generation but also the grid usage for all the connected buildings.
Get in touch!
If you would like a Solar Panel Installation in Torquay quote by our dedicated in house team who provide a full turn key service, then contact us today.