Case Study
Cleveland St Mary | Lustleigh
Project Details:
Client Name: Mr Berry
Industry: Domestic
Website: N/A
Location: Lustleigh
Project Completion: June 2024
£900
Estimated Annual Electricity Bill Savings *
24,219
Car km Avoided *
156
Tree’s Planted *
What were they trying to resolve:
Mr Berry was looking for a system to help reduce ever growing energy costs whilst making sure the panels were subtle and in-keeping with the local area. Due to the age of the property, we had limited roof space and obstacles to contend with during the planning process.
Services Provided:
Technical Survey
Roof Inspection
In-Roof Mounted Solar PV
DC Electrical Connections
AC Electrical Connections
Full design and DNO consultation
NICEIC and MCS Certification
Full Online Panel Level Monitoring
Individual Panel Optimisation
What was the solution?
Due to multiple roof directions, obstacles and keeping the system aesthetically pleasing we proposed an in-roof system using SolarEdge technology to minimise shading issues and increased system safety.
As the target roofs were being renewed it was the perfect opportunity to install the in-roof system and saving on tiling costs.
What was the result?
We installed 8 x 455W high powered all black solar panels on an in-roof GSE mounting system accompanied with the SolarEdge optimised technology ticking all the boxes for optimal generation, combat shading & pleasing to the eye.
Get in touch!
If you would like a Solar Panel Installation In Newton Abbot by our dedicated in house team that provide a full turn key service then contact us today.
* These are estimated figures based on the system lifespan.