About the client
Stovax and Gazco are industry leaders in log burners, gas, and electric fires, serving the UK and Europe for over 40 years and operating in over 25 countries.
They specialise in the manufacture of high-quality wood-burning, multi-fuel, gas, and electric stoves, fires, and fireplaces.
The challenge
Due to their exceptional growth, Stovax and Gazco were operating out of seven separate buildings within an industrial estate in Exeter. The scattered setup posed significant operational issues leading to:
Logistical challenges
Inefficiencies in workflow
Increased operational costs
Managing inventory across multiple locations
To streamline their operations and improve efficiency they needed to bring their activities under one roof. For this, they turned to Western Industrial and M&E Contrax for expert assistance.
Our solution
M&E Contrax developed a comprehensive electrical and mechanical service scheme to accommodate new layouts and relocate existing equipment to the new premises. Here’s how our electrical contractors assisted Stovax and Gazco:
Data collection: Spent weeks gathering data from all existing buildings to create a complete design for the move
Flexible design: Designed a solution with maximum flexibility to adapt to changing demands and department requests
LED lighting: Installed efficient LED lighting throughout the new premises
TPN machine supplies: Ensured reliable TPN machine supplies
SPN socket outlets: Provided Single Phase Neutral (SPN) socket outlets
Containment installation: Implemented comprehensive containment solutions
HVAC installation: Integrated industrial heating, ventilation, and air conditioning systems
CAT6 Data Network: Established a robust CAT6 data network
Fibre link installation: Installed fibre link for seamless connectivity
NICEIC Certification: Helped with NICEIC certification for electrical safety and compliance
The result
M&E Contrax delivered a successful project that met Stovax and Gazco’s requirements, resulting in consolidated operations by bringing all activities under one roof. This included comprehensive electrical installations to meet immediate requirements and support future growth.
The project was completed on time, adhering to all deadlines, and managed costs efficiently throughout the process, ensuring a cost-effective solution for Stovax and Gazco.