MCS accredited installers in Devon

Solar Panel Installation

Designed, installed and certified by our own local team

  • Over 20 years installing across Devon and the South West
  • MCS accredited for solar PV and battery storage
  • Free, no-obligation survey and honest advice
M&E Contrax engineer installing solar panels

MCS

certified installer

Accredited & approved

MCS certified NICEIC Approved Contractor RECC member TrustMark Fox ESS Elite Installer SolarEdge
Solar panels installed on a home in Devon by M&E Contrax

Your local solar installers

Solar installation, done properly

M&E Contrax Renewables designs and installs solar panel systems for homes and businesses across Devon, Cornwall and Somerset. We’re based in Newton Abbot, MCS accredited for solar PV and battery storage, and NICEIC approved for all electrical work.

Every installation is carried out by our own in-house team, from the first survey and system design through to commissioning, MCS certification and aftercare. If solar isn’t right for your property, we’ll tell you.

20+ years

installing in the South West

In-house

no subcontracted installs

Free

site survey

Book a free survey

Domestic solar

Built for Devon homes

Devon has a real advantage for solar. Exeter receives around 1,237 kWh of solar irradiance per square metre each year, roughly 13% above the UK average, so a well-designed system here generates more than the same system further north.

We install on every type of Devon property, and the roof decides the design. We carry out a thorough roof assessment at every survey, covering:

  • Natural slate, concrete tile and flat roofs
  • Victorian terraces, post-war semis, farmhouses and new builds
  • Roof age, orientation and shading
  • Planning, including listed buildings and conservation areas

Most of our domestic installs now include battery storage, which raises the share of solar you use at home from around 35% to 70–80%.

Solar panels installed on a flat roof in Devon

Why go solar

What solar panels do for you

Solar is a long-term investment that starts paying back from the day it’s switched on.

Lower electricity bills

Every unit you generate and use yourself is one you don’t buy from the grid.

Get paid for surplus

Sell the electricity you don’t use back to the grid through the Smart Export Guarantee.

Fix your energy costs

Protect yourself against future price rises by generating your own power.

Lower your carbon footprint

Clean, renewable electricity from your own roof for 25 years and more.

How it works

Our six-step installation process

One team manages everything from first contact to switch-on, so you always know what happens next.

1

Get in touch

Tell us about your property and what you’d like to achieve, and we’ll arrange a survey.

2

Free site survey

We assess your roof, your electricity use, your future plans and the planning position.

3

System design

Our design team specifies panels, inverter and battery options for maximum output.

4

DNO and paperwork

We handle the network operator (DNO) notification or application and any approvals.

5

Installation

Our own engineers install your system safely and tidily, usually in one to two days for a home.

6

Commissioning and MCS

We test and commission everything, then hand over your MCS certificate and warranties.

Free home survey

Book your free solar survey

Leave your details and our local team will call you back to arrange a free, no-obligation survey of your home.

No obligation and no hard sell

MCS and NICEIC accredited

Our own team, based in Devon

Prefer to talk?

01364 654271

Request a call back

We usually call back within one working day.

Thank you, we’ve got your details

A member of our local team will call you back shortly to arrange your free, no-obligation survey.

Need us sooner? Call 01364 654271

FAQs

Solar installation FAQs

Do solar panels work on cloudy or rainy days?

Yes. Solar panels generate from daylight, not direct sunshine, so they still produce electricity on cloudy days, just less than in full sun. Annual generation estimates already allow for typical UK weather.

How long does a solar installation take?

Most home installations take one to two days once scaffolding is up. Larger commercial and farm systems take longer, and we’ll give you a clear programme before work starts.

Do I need planning permission for solar panels?

Most domestic roof-mounted systems fall under permitted development, so planning permission isn’t needed. Listed buildings, some conservation areas and certain flat roof or ground-mounted systems may need consent. We check this at your survey.

Why does MCS certification matter?

MCS certification shows your system has been designed and installed to the industry standard. You need an MCS certificate to receive payments through the Smart Export Guarantee, and it helps when selling your home.

Can I add a battery later?

Yes. A battery can be added to most systems at a later date. If you think you’ll want one, we can design your system with a battery-ready inverter to make adding it simpler and cheaper.

Do you install solar for businesses?

Yes. We design commercial systems around your actual site consumption, manage the DNO process for you, and can advise on the Annual Investment Allowance, which lets you deduct the full cost from taxable profits in the year of purchase.

Which areas do you cover?

We’re based in Newton Abbot and install across Devon, including Exeter, Torbay, Plymouth and the South Hams, as well as throughout Cornwall and Somerset.

Planning a project? Talk to our team.

Call us on 01364 654271 or send us a few details and we will get back to you.