The short answer: most commercial premises require an EICR (Electrical Installation Condition Report) at least every five years, though the correct interval depends on the type of property, how it is used, and the findings of the previous report. High-risk environments such as swimming pools, petrol stations and properties with high equipment turnover may require annual inspections. The Electricity at Work Regulations 1989 place a legal duty on employers and property managers to keep electrical installations safe – and a current EICR is the standard way to demonstrate compliance.
Commercial landlords, facilities managers and business owners frequently ask about EICR requirements – not because they want to do the minimum, but because the rules are not always set out clearly in one place. This guide brings it all together.
What Is an EICR?
An EICR – Electrical Installation Condition Report – is a formal assessment of the electrical wiring, sockets, consumer units, switches and earthing systems within a building. The purpose is to identify anything that does not meet current standards (BS 7671, the IET Wiring Regulations) or that could present a danger to the people using the building.
At the end of the inspection, the report assigns one of four observation codes to any items requiring attention:
- C1 – Danger present: risk of injury; immediate remedial action required
- C2 – Potentially dangerous: urgent remedial action required
- C3 – Improvement recommended: no immediate danger, but should be addressed
- FI – Further investigation required: the inspector cannot determine the extent of a problem without further work
A report is classified as Satisfactory only when there are no C1 or C2 items. Any C1 or C2 codes result in an Unsatisfactory classification, which requires remedial work before the installation can be signed off as safe.
EICR Frequency by Commercial Property Type
The table below sets out the recommended (and in some cases legally required) intervals for commercial EICR inspections. These are drawn from BS 7671 Appendix 6 (recommended intervals) and sector-specific statutory guidance.
On smaller screens, scroll across to see the full table.
| Property Type | Recommended Interval | Notes |
|---|---|---|
| General commercial offices | 5 years | Standard interval for low-risk office environments |
| Retail premises | 5 years | Review if equipment is frequently changed or extended |
| Industrial / manufacturing | 3 years | Higher risk due to plant, machinery and load variation |
| Schools and educational premises | 5 years | Statutory guidance under DfE requirements |
| Hospitals and healthcare | 1–5 years | Depends on area classification; theatres and ICUs more frequent |
| Hotels and accommodation | 5 years | Includes common areas; individual rooms may vary |
| HMOs (Houses in Multiple Occupation) | 5 years | Mandatory under HMO regulations for licensed premises |
| Caravan parks | 1 year | Statutory – site licence condition in most cases |
| Swimming pools and leisure centres | 1 year | High-risk environment due to water; statutory requirement |
| Petrol stations / fuel retail | 1 year | Hazardous area classification requires annual inspection |
| Agricultural premises | 3 years | BS 7671 Appendix 6 guidance for agricultural buildings |
| Churches and places of worship | 5 years | Often older wiring; earlier re-inspection if C2 codes found |
| Theatres and entertainment venues | 3 years | Complex electrical systems; high-use environment |
Important: The intervals above are the maximum recommended intervals. The previous EICR may specify an earlier re-inspection date based on the condition found at the time. Always follow the recommendation on your most recent report – if it says re-inspect in two years, that takes precedence over the general guidance for your property type.
What Triggers an Earlier EICR?
A five-year interval is not a guarantee that five years is always appropriate. The following circumstances should prompt an earlier inspection regardless of when the last EICR was carried out:
- Change of occupier or tenant – a new tenant takes on responsibility for their own electrical safety, and an EICR at the point of letting protects both parties
- Significant building alterations or rewiring – any substantial change to the electrical installation should be followed by an EICR to confirm the whole system is sound
- Major equipment changes – adding heavy plant, new distribution boards, or substantially increasing electrical load
- Fire or flood damage – even if the electrical installation was not directly affected, post-incident inspection is prudent and may be required by your insurer
- Insurance renewal – some commercial insurers now require a current EICR as a condition of cover; a report more than five years old may not satisfy this requirement
- Previous unsatisfactory report – if remedial work was carried out following a C1 or C2 finding, a follow-up inspection confirms the remediation was effective
- Purchase of a commercial property – buyers should obtain an EICR before completion or immediately after; relying on the seller’s documentation carries risk
The Legal Position
Electricity at Work Regulations 1989
Regulation 4 of the Electricity at Work Regulations 1989 requires that electrical systems are maintained “so far as is reasonably practicable” to prevent danger. Employers and those in control of a workplace are responsible for compliance. While the Regulations do not specify a mandatory interval for inspections, the Health and Safety Executive (HSE) consistently references the BS 7671 recommended intervals as the benchmark for what “reasonably practicable” looks like in practice.
Landlords and the RICS Guidance
The Royal Institution of Chartered Surveyors (RICS) recommends that commercial landlords obtain an EICR every five years for tenanted commercial premises. In practice, commercial leases increasingly include clauses requiring the landlord to maintain a current EICR and provide a copy to tenants on request.
HMOs – Mandatory Requirements
For Houses in Multiple Occupation (HMOs) required to be licensed under Part 2 of the Housing Act 2004, the Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020 make five-yearly EICR inspections a legal requirement. The report must be carried out by a qualified and competent person, and a copy must be provided to tenants within 28 days of the inspection.
Schools – DfE Guidance
The Department for Education’s guidance on school premises (Building Bulletin 87 and Condition Improvement Fund criteria) references five-yearly electrical inspection as the appropriate standard for educational buildings. Academies and maintained schools are expected to follow this guidance as part of their estate management obligations.
What Happens During a Commercial EICR?
A commercial EICR involves a visual inspection and, where required, a series of electrical tests. The depth of testing depends on the size and complexity of the installation and the agreed scope of work.
- Visual inspection – checking condition of consumer units, wiring, sockets, switches, earthing and bonding, and identifying any obvious damage or non-compliant work
- Dead testing – conducted with the electrical supply turned off; tests continuity of protective conductors and ring circuits, insulation resistance, and polarity
- Live testing – conducted with the supply on; includes checks such as earth fault loop impedance and operation of RCDs (residual current devices)
- Distribution board inspection – checking circuit labelling, overcurrent protection, and the condition of busbars and connections
- Report compilation – the inspector records all observations, assigns codes, and provides the completed EICR document with any recommended remedial work
For large commercial premises, inspections are often conducted in phases to avoid disrupting operations – testing one distribution board or floor at a time, with the full report compiled at the end.
Who Can Carry Out a Commercial EICR?
Under the Electricity at Work Regulations, the inspection must be carried out by a “competent person.” In practice, this means a qualified electrician with demonstrable knowledge of the current wiring regulations (BS 7671) and experience in the type of premises being inspected.
NICEIC-approved contractors are the benchmark for commercial electrical inspection work. NICEIC approval requires individual engineers to demonstrate competence, and the contractor is subject to ongoing assessment. When an EICR is carried out by an NICEIC-approved contractor, the report carries the weight of independent verification that the inspector meets the required standard.
M&E Contrax holds NICEIC Approved Contractor status. Our engineers carry out commercial EICRs across Devon and the South West, covering offices, retail premises, HMOs, industrial units, schools and healthcare facilities.
Book a Commercial EICR in Devon
If you are not sure when your last EICR was carried out, or whether your current report is still valid, get in touch. We can check the date and scope of your existing report and advise whether a new inspection is due.
We carry out commercial EICRs across Devon including Exeter, Plymouth, Torquay, Newton Abbot, Barnstaple, Okehampton and surrounding areas. For multi-site portfolios, we can coordinate inspections across locations under a single contract.
Request a commercial EICR quoteFrequently Asked Questions
Is an EICR a legal requirement for commercial properties?
There is no single law that specifies an EICR must be carried out at a fixed interval for every commercial property. However, the Electricity at Work Regulations 1989 require employers to keep electrical systems safe, and an EICR is the standard way to demonstrate compliance. For certain property types – HMOs, caravan parks, swimming pools – specific regulations make inspections mandatory.
How long is a commercial EICR valid for?
Validity depends on the property type and the outcome of the inspection. As a general rule, most commercial properties should be re-inspected every five years. High-risk environments require annual inspection. The previous report may also specify a shorter interval – always follow the recommendation on your most recent certificate.
What happens if a commercial EICR comes back unsatisfactory?
An Unsatisfactory result means the report has identified C1 (danger present) or C2 (potentially dangerous) observations. C1 items require immediate action – in serious cases the circuit or installation should be isolated until remediated. C2 items are urgent but not immediately dangerous. Remedial work should be carried out by a qualified electrician and documented, after which a follow-up inspection confirms the installation is now satisfactory.
Can we carry out an EICR in phases to avoid business disruption?
Yes. For large commercial premises, it is common to carry out testing in phases – by floor, by distribution board, or by zone – so that no single area loses power for an extended period. We discuss the best approach for your premises at the planning stage.
Do I need an EICR when taking on a new commercial lease?
This depends on the lease terms, but taking on an EICR at the start of a tenancy is strongly advisable regardless of what is required. It establishes the condition of the installation at the point of occupation, protects the incoming tenant from liability for pre-existing faults, and satisfies many insurers’ requirements.